Construction Progress

Although the framing went up super quickly and gives the immediate sense of progress, the utilities don't feel quite as exciting.  The electricians and plumbers have been working away installing new wiring, conduit, switch boxes and piping/valves.  We've been specifying the minute details of where we want outlets and switches with suggestions from the contractors.  The inspections should be done by the end of the week - electrical, plumbing, framing.  Heating and cooling are scheduled for early this week and then the insulation and plastering should also be done with insulation inspection by the end of the week.  I didn't realize how many inspections take place during the course of the project.  Hopefully all goes well.  We're very eager for the end of the week when the space will look and feel like almost complete rooms.  Here are some photos of the recent work.


Hallway Before New Opening
New Opening to Bedroom
Full Hallway View
New Wall to Extend the Hallway/ Future Baby's Room ;)
Office Sliding Door In-filled
Bedroom Ceiling with Rough Electrical
Bathroom Rough Plumbing
New Shower Base

No comments:

Post a Comment